Is there a secret to competitive bidding?
Not a secret, but there are certainly ways to find a better price – and some ways work better than others. If there was a secret, a magic bullet, that one tool in your tool belt you just couldn’t live without, then value engineering would be it. Call it the duct tape of competitive bidding. When you need to cut the total price of your project, value engineering is most often your answer.
In every aspect of a metal building, you can tweak the cost – adjust the finish, the panel thickness, panel profile. These are all possible value engineering adjustments that will create pricing decreases. Typically these kind of panel adjustments might make just a few percentage points difference, if that. Primary framing, however, is more like the value engineering homerun. Frames usually represent 30 to 40 percent of the total metal building cost. Change the framing and you have the opportunity to affect 10 to 20 percent savings to the metal building portion of the project. And the crowd goes wild.
Is tweaking the framing possible? Absolutely.
One of the most effective framing solutions is increasing the roof slope in clear span buildings that are more than 80 feet wide. As the roof slope goes up, the pricing comes down. Here’s how it works:

Let’s say you are building a 200-foot soccer complex. With a 1 to 12 roof slope, any roof weight, such as snow, pushes down on the complex and creates a lot of kick out on the columns. There is a lot of outward force because the roof structure is almost flat. To counter this, you have larger rafters and columns.
Now, let’s change the roof slope to a 3 on 12.

The Roman Colosseum is considered one of the most perfect architectural buildings ever built. Why? Because it’s based on the use of arches. The arch shape actually counteracts the weight you are putting on it. By making our soccer complex into a more arched structure with the roof slope increase you’ve created a structure that will use smaller rafters and columns.
A larger roof span increases your roof slope but saves you money.
Whenever I offer this solution, one of the first questions I get asked is: But won’t that mean more roof panels, more end wall panels and more end wall girts? Yes. It will. However, even with that extra material, you will be saving so much on the frames that you will still net savings.
Yes. It’s that big of a value. It’s the homerun, don’t forget.
If you only have the opportunity to do one value engineering change, this is it. In clear span buildings over 80 feet, this is you hitting one out of the park.
Do you have other value engineering questions? Send them my way by posting them below.
Become part of the powerful Star network. We invest in builders who understand the value of results and provide support that develops strong relationships between you and the entire Star team.
Your building is the cornerstone of the community where people live, work and play. Find a local Star Authorized Builder and let us help you bring your vision to life.